The future Garvanza Pump Station Replacement Project (Garvanza PS), which is expected to begin construction in 2027, will:

  • Increase the reliability and flexibility of LADWP’s water system;
  • Demolish and replace Garvanza PS;
  • Install 1,550 linear feet of new pipe;
  • Upgrade Highland Reservoir Regulator Station;
  • Mitigate severe structure deficiencies, and;
  • Increase pumping capacity.
  • Demolish and replace existing Garvanza PS;
  • Demolish and replace Garvanza PS.

Construction Schedule

Summer 2027 – Early 2031

Neighborhood

Highland Park