Project Description 

The Barham Mainline Improvement Project will install 2,853 feet of 20-inch mainline pipe along a section of Barham Blvd. from just south of Craig Dr. to just south of Lakeside Plaza Dr. Additional fire services will be installed. 

This work will increase the existing pipe diameter for increased water flow, improving fire safety and water system reliability for the local area.

Construction Information 

Work will take place M-F from 7 a.m. to 7 p.m. Some Saturday work may be necessary. LADWP received a Peak Hour Exemption from the Department of Transportation in order to reduce the project from eight months in duration to four and a half.

Traffic & Parking 

Work will occur in the middle of Barham, and it will be done in 300-foot sections. In those sections, traffic will be reduced to one lane in each direction. A small area of about 150 feet of street parking on the east side of Barham will be unavailable while construction is occurring in that area. There will be little to no impact to the sidewalks along Barham. 

LADWP is committed to completing this project as quickly and as safely as possible.

Project Schedule 

January 2022 – June 2022

Region 

Hollywood Hills

Contact

Project Manager
Shahan Janoyan
818-771-4287
[email protected]

Community Affairs
Michael Ventre
213-367-1381
[email protected]