Project Description

The Toyopa Dr. (Potrero Canyon) Mainline Replacement Project is an important part of LADWP’s plan to improve water systems throughout the city.

The existing pipeline will be replaced with 6-inch and 8-inch diameter Earthquake Resistant Ductile Iron Pipe (ERDIP).

This project is essential to improving overall water reliability and flexibility

Construction Information

LADWP crews will install 8,700-feet of new pipe along Toyopa Drive, Corona Del Mar, Alma Real Drive, Alva Drive, La Cumbre Drive, Ramos Place, and Altata Drive.

Residents will be notified 48 hours in advance of any planned interruption in water service, although in an emergency you may experience unplanned water interruptions. Water interruptions, if any, will last no more than 4 hours.

Toyopa Dr. (Potrero Canyon) Mainline Replacement Project Map

Project Schedule

Summer 2025 – Summer 2026

Traffic and Parking

All streets will remain open and available for public access. No street closures are required.

To provide adequate space for construction crews and to ensure public safety, “Temporary Tow-Away, No Stopping” and “No Parking” signs will be posted around the work area.

Construction Schedule

Monday to Friday, 7 am – 5 pm
Saturday, 7 am – 5 pm (As needed)

Contact Us

Western District Engineering Associate: Oscar Tupul | 213-367-3980 | [email protected]
Community Liaison: Leah McKenzie | 213-367-5162 | [email protected]