益处

List of Program Benefits Pure Water Los Angeles; Equity, invest in communities; Climate Justice, safeguards the availability of water for all Angelenos; Environmental, protects the Santa Monica Bay; Workforce Development, generates good paying sustaining jobs; Economic, maximizes cost-effective production; Transparency, ensures stakeholders are well-informed; Partnerships, leverages regional participation.

 

还有哪些地方会发生这种情况?

Continental United Sates Map of Global purified recycled water locations

 

纯净的再生水并不是一个新概念,它已经在全美范围内得到安全使用。这里有一张美国城市地图,这些城市已经在使用净化后的再生水,不仅用于灌溉,还用于饮用水。

现在,洛杉矶也加入了这一经过验证、不断发展的运动,为我们的未来带来源于本地、更可靠、更可持续的本地供水。

如何使用

虽然已经完成了许多规划会议和研究,但未来几年还将开展更多的工作、测试和外联活动。

Water Supply Map of City of Los Angeles outlining Water Supply
Indirect Potable Reuse (DPR) image diagram: Left to right: Image of City Scape and House (Customers), next, Hyperion Wastewater Treatment Image, next, DPR Advanced Water Purification Facility, next, water pumped in to groundwater Replenishment, Next Groundwater Treatment Facility, next, Drinking Water Distribution back to Customers

随着现有处理和分配设施的改造以及新基础设施的建设,实施工作也需要时间。据估计,整个城市将需要长达 42 英里的新配电管道和超过 65 英亩的房地产。 分阶段建设该系统将加快供水速度,并允许对水费进行逐步和可控的调整。一期工程完工后,每天可生产多达 5000 万加仑的净化再生水。

Direct Potable Reuse (DPR) image diagram: Left to right: Image of City Scape and House (Customers), next, Hyperion Wastewater Treatment Image, next, DPR Advanced Water Purification Facility, next, Drinking Water Distribution back to Customers

对齐是指管道将遵循的路径。有关管道对齐替代方案的定义,请参阅Pure Water Los Angeles词汇表。

项目时间表

拟议时间表反映的是概念层面的估算,可能会根据资源和资金限制而发生变化。Pure Water Los Angeles目前处于第三阶段。

Pure Water Los Angeles Project Phases

*总体规划和 Hyperion 计划实施规划

环境审查

请访问Pure Water Los Angeles(前身为 Operation Next)CEQA 网站,获取与加州环境质量法案 (CEQA) 合规性相关的文件和更新信息。

资源